Skip to content

Bathroom remodels in Oklahoma City

Walk-in showers, new tile, vanities and full gut remodels, built so they look good and stay watertight for years.

A bright bathroom with a glass walk-in shower, white tile and a double vanity1-year labor warranty

Scope of work

  • Tub-to-shower conversions and walk-in showers
  • Tile floors, shower walls and backsplashes
  • Vanities, mirrors, lighting and fixtures
  • Proper waterproofing behind every wet wall
  • Drywall, paint and trim to finish the room

A bathroom is a small room with a big job. It has to handle water every day, stay easy to clean and still feel good to walk into. A remodel is the chance to get all three right.

Signs it’s time

  • Cracked or loose tile, or grout that’s dark and crumbling no matter how much you scrub.
  • A soft or bouncy floor near the tub or toilet, which often points to water getting where it shouldn’t.
  • Peeling paint and mildew that keep coming back, a sign of poor ventilation.
  • A tub you never use. Many homeowners would rather have a roomy walk-in shower.
  • It just doesn’t work for you, like no storage, one sink for two people, or a step-in tub that’s getting harder to climb over.

What the work involves

Most of what makes a bathroom last is hidden. After tear-out, we look at the subfloor and framing and fix anything that’s damaged. Shower walls and floors get a proper waterproofing layer before any tile goes on, because grout and tile alone don’t keep water out.

Then comes the part you see: tile, the vanity, mirrors, lighting, fixtures and glass. We finish with drywall repairs, paint and trim, and clean up so the room is ready to use.

What affects the price

Size matters less in a bathroom than you’d think. The biggest factors are tile, especially on shower walls, whether plumbing moves, and the fixtures you choose. A custom tiled shower costs more than a prefabricated surround, but it can be shaped to the room and lasts for years.

When a smaller update makes sense

If the tile and tub are sound, a new vanity, lighting, mirror and paint can refresh the room without a full gut. We’ll tell you which way gets you the most for your budget.

Sequence

What to expect

  1. 01

    Look at the space

    We check the room, the floor and what's behind the walls where we can, and talk through what you want.

  2. 02

    Pick finishes

    Tile, vanity, fixtures and glass. We'll help you narrow the choices so they work together.

  3. 03

    Tear-out and prep

    The old bathroom comes out and we fix anything we find, like soft subfloor or old water damage, before building back.

  4. 04

    Build and finish

    Waterproofing, tile, fixtures and paint, then a final walk-through with you.

Questions

Bathroom remodeling questions

Something else on your mind? Call or text us and ask.

(405) 446-8962
Can you turn my tub into a walk-in shower?

Yes, it's one of the most common bathroom projects we do. We'll check the space, the drain location and the floor to plan the right shower size and entry.

What happens if you find water damage behind the wall?

We show you what we found, explain the fix and what it adds to the cost, and only go ahead once you agree. It's much better to repair it now than to tile over it.

How long will I be without the bathroom?

That depends on the scope, and tile and grout need time to cure. If it's your only bathroom, tell us early so we can plan the work to keep that time as short as possible.

Estimate

Let's talk about your project

Tell us what you have in mind. The estimate is free, and there's no pressure to sign.